Documentation · Data
Funnel chart
Write the stages from the widest to the narrowest, one per line. Each bar is as wide as its count.
When to use it
Show how many are left at each stage of a process: a sales pipeline, website conversion or a recruitment process.
Write the stages in the order people move through them. A funnel compares stages; to compare categories with no order, use a bar chart.
Working example
Copy this complete example into the Source tab, then press Generate. Change its labels or values to make your first version.
funnel "Website conversion" {
Visits 12000
"Product views" 5400
"Added to cart" 1900
Checkout 820
Purchase 610
}Syntax reference
The same reference used by the editor and AI briefing. Syntax is notation-specific; use the keywords listed here.
Chart
| Syntax | Meaning |
|---|---|
funnel "Title" { | open a funnel chart |
Stages
| Syntax | Meaning |
|---|---|
Visits 12000 | one stage, named and counted, widest first |
"Added to cart" 1900 | a name with a space goes in quotes |
Funnel
| Syntax | Meaning |
|---|---|
percent on | write each stage's share of the first |
Look
| Syntax | Meaning |
|---|---|
colors colorful | auto, single, colorful, warm, cool, ink |
colors "#2a78d6" | one colour, pinned |
style framed | plain, ruled, framed, bold |
legend bottom | auto, none, right, bottom, top |
values on | write the number on every mark |
size 520 340 | how big the chart is drawn |
# comment | line comment (also //) |
Language rules
- The file is one funnel "Title" { ... } block. Nothing may sit outside it.
- A stage is Name 1200, one per line, from the first stage to the last.
- A funnel is one run of stages: it takes no series, categories, bars, layout or grid lines.
- Settings are written as name value, in any order.
- Do not invent settings. Every one the language has is listed above.
Edit on the canvas
- Drag a bar's end to change a stage's count, or edit stages in the chart panel.
- Turn the share of the first stage on or off in the chart panel.
Generate replaces the drawing from source. Save before generating again if you want to preserve manual finishing touches.
Read Saving & exportingWrite it with an assistant
Tingraph AI already knows this notation. For another assistant, copy the tutorial below, describe your diagram under MY DIAGRAM, then paste the returned source into the editor. This prompt includes every syntax row, rule and working example above.
Read the complete prompt
You are writing Tingraph source. Tingraph is a small text language that draws a funnel chart. Answer with Tingraph source only.
SYNTAX
Chart
funnel "Title" { open a funnel chart
Stages
Visits 12000 one stage, named and counted, widest first
"Added to cart" 1900 a name with a space goes in quotes
Funnel
percent on write each stage's share of the first
Look
colors colorful auto, single, colorful, warm, cool, ink
colors "#2a78d6" one colour, pinned
style framed plain, ruled, framed, bold
legend bottom auto, none, right, bottom, top
values on write the number on every mark
size 520 340 how big the chart is drawn
# comment line comment (also //)
RULES
- The file is one `funnel "Title" { ... }` block. Nothing may sit outside it.
- A stage is `Name 1200`, one per line, from the first stage to the last.
- A funnel is one run of stages: it takes no `series`, `categories`, `bars`, `layout` or `grid` lines.
- Settings are written as `name value`, in any order.
- Do not invent settings. Every one the language has is listed above.
WORKED EXAMPLE
funnel "Website conversion" {
Visits 12000
"Product views" 5400
"Added to cart" 1900
Checkout 820
Purchase 610
}
OUTPUT
- Reply with one fenced code block and nothing else.
- The block starts with `funnel "…" {` and ends with `}`.
- Do not invent keywords: use only the ones listed above.
- Keep labels short enough to read inside a box, and keep every ID unique.
MY DIAGRAM
Describe what you want here, then send this message.Something unclear? Contact support or read the Privacy Policy.